Accessory dwelling units / South Bay

ADU construction, planned around your property.

A backyard cottage, an attached unit or a garage conversion starts with the same question: what can the property support? R&B Master Construction Inc. can review the proposed scope, discuss the construction process and confirm fit before proceeding.

San Jose permit resources

Choosing a direction

Three ADU options to consider.

01

Detached ADU

A separate backyard living unit. Review available space, access, utilities, setbacks and foundation conditions before choosing a layout.

02

Attached ADU

An accessory unit connected to the main home. Evaluate how the structure, roof, building systems, entrances and privacy will work together.

03

Garage conversion

An existing-space conversion where property conditions and regulations permit. Confirm structural, energy, fire and utility needs before committing to a budget.

From property to construction

A clearer path to your ADU.

01

Property review

Identify the parcel, existing buildings, access, utilities, prior permits and available site information. Project eligibility is not assumed without a property review.

02

Design and construction scope

Decide the type of unit, approximate floor area and interior priorities. Coordinate drawings, structural design, building systems and scope responsibilities.

03

Permits and approvals

Confirm the current state and city requirements, application documents, responsible applicant and inspection stages before scheduling work.

04

Construction planning

Discuss site work, foundations or conversion work, framing, connections, finish allowances, access, schedule dependencies and an itemized proposal.

Regulations and property conditions

Use current ADU rules.

California's Department of Housing and Community Development updated its ADU Handbook in March 2026. State law, local processing, building codes and property conditions must be considered together. Do not assume that an example unit size or plan is approved for your lot.

Included with every R&B service

ADU design, plans & permits included

R&B's ADU projects include the plans and the permit, start to finish. We begin with the parcel: setbacks, existing buildings, access and the utility routes to the new unit. Then our in-house architect prepares the architectural plans, with structural and Title 24 energy work coordinated with engineers. In San José, an ADU follows the City's ADU Service: the application starts at SJPermits.org and the plan set, prepared to the City's Bulletin 211, is uploaded to SJePlans. The checklist also asks for a letter from your water company with hydrant flow data, an item the City says often delays projects. We assemble the package, respond to review comments and schedule inspections from foundation to final. Other cities run their own ADU processes, so see your city page. How we handle permits.

Building outside San José? Each city page lists that city's permit portal.

Before you begin

Questions about ADU construction.

Every home is different. Let’s talk through the details of yours.

Can I put a detached ADU in my San Jose backyard?

Possibly. The answer depends on the parcel, applicable state and local regulations, existing improvements, utility capacity and site conditions. Confirm eligibility and permitted size through the appropriate city process.

Is a garage conversion an option?

Some existing garages can be converted into an ADU. Building structure, utilities, life-safety requirements and the applicable approval process need review first.

How much does an ADU cost?

The cost varies substantially by size, site conditions, design, foundations, utility connections, permit requirements and finishes. A proposal requires a defined scope and review of the existing property.

Who handles ADU drawings, permits and inspections?

R&B does, with architectural plans from our in-house architect and engineering coordinated as needed. We prepare the submittal, answer plan-check comments and schedule inspections. City fees are clarified in your proposal.

What is the San José ADU permit process?

The City's ADU Service starts with an application at SJPermits.org. Plans prepared per Bulletin 211, the required forms and a water-company hydrant flow letter are uploaded to SJePlans for plan review, and corrections are resubmitted the same way.

Begin a conversation

A new beginning.
Let’s talk.

You don’t need to have it all figured out. Tell us where you are with your project, and we can discuss the next step.

(650) 800-9661info@rbmasterconstruction.com

Residential projects and commercial build-outs across the San Francisco Bay Area.

What do you have in mind?

Leave an email or phone number. Everything else is optional. Share your project details and our team will contact you to review the scope and schedule your free estimate.

Add project details Optional
Add location, budget or timing Optional details

We’ll contact you about your inquiry. How we use your information.

Call

A good place to begin

Let’s talk about your project.

Leave an email or phone number. Everything else is optional. Share your project details and our team will contact you to review the scope and schedule your free estimate.

Project: Not sure yet

Add project details Optional
Add location, budget or timing Optional details

We’ll contact you about your inquiry. How we use your information.