R&B Master Construction Inc. / Fremont

Bathroom Remodeling in Fremont

Fremont bathrooms updated in place or fully reconfigured, from our San Jose headquarters.

Fremont bathrooms in 1960s and 1970s houses often still have their original tub surrounds and narrow vanities. We plan the new room, choose the right City permit route and build it.

(650) 800-9661
CSLB #115865784 W Santa Clara St, Suite 700San Jose, CA 95113

Bathroom remodeling / Fremont

Keeping the layout or changing it in Fremont.

If your Fremont bathroom keeps its walls and fixtures in roughly the same place, the update can often use the City's express permit. That route still covers new tile, a new vanity and a rebuilt shower.

When the goal is a larger shower, a double vanity or a wall moved into a closet, the drawings go to full plan review. We show you both options so the trade-off is clear.

Architectural services by our in-house licensed architect; design, architectural drawings and permits included.

Included in the scope

One contract, design through final inspection.

01

Two-option scope

We outline an in-place update and a reconfigured layout so you can compare them before design is finalized.

02

Bathroom plan set

Our architect documents fixture locations, shower dimensions and any wall changes for the City.

03

Express or regular filing

We file the Fremont permit that fits the final scope with the Building & Safety Division.

04

Waterproofing specification

The shower membrane, curb and drain are specified in writing before tile is ordered.

05

Build and inspections

Our crew completes the bathroom and meets the inspector for each stage the City requires.

City of Fremont Building & Safety Division

Fremont's review for bathroom work.

Fremont's express permit list includes residential bathroom remodels with no wall removal or alteration, while relocated walls or added space need a regular permit.

  1. Pick the route. We compare your scope against the express list and recommend the matching application.
  2. Submit through the City's system. Applications are filed online with Fremont, and regular permits include plan review of the drawings.
  3. Inspect at each stage. Rough plumbing, wiring and waterproofing are inspected before covering, followed by a final.

Bathroom remodeling process / Fremont

The order of work for a Fremont bathroom.

Step 1

Compare two layouts

We sketch the bathroom as it is and as it could be with a borrowed closet, so you can weigh the extra review against the extra space.

Step 2

Lock the shower details

Drain position, curb height, niche locations and glass type are fixed on the Fremont drawings before tile is chosen.

Step 3

File and wait for issue

We submit through Citizen Access and keep the start date tied to the day Building & Safety issues the permit.

Step 4

Open, inspect, close

Walls are opened, rough plumbing and the shower pan are inspected, then tile, fixtures and the vanity go in before the final visit.

Permit notes

Fremont permit notes for bathrooms.

Swapping a tub for a shower in the same footprint usually stays on Fremont's express list, while shifting a wall into a hall closet does not.

Fremont inspectors look at the shower pan before it is covered, so tile setting waits until that sign-off is on the job card.

Typical timeline

What sets the pace of a Fremont bathroom.

An in-place Fremont bathroom mostly depends on how quickly fixtures and tile arrive, since the express route avoids a long review.

A reconfigured room adds plan check up front and more framing work later, which is why we show both options side by side.

San Jose Office (Headquarters)

84 W Santa Clara St, Suite 700

84 W Santa Clara St, Suite 700, San Jose, CA 95113. Call (650) 800-9661. CSLB #1158657. More about working with us in the city on our Fremont contractor page, and the full bathroom remodeling service overview. Planning both rooms? See kitchen remodeling in Fremont.

Before you begin

Fremont bathroom remodeling questions.

Every home is different. Let’s talk through the details of yours.

Is my Fremont bathroom eligible for an express permit?

Often, if no wall is removed or altered. A bathroom that grows into a closet or moves a wall goes through a regular permit with plan review.

Can a Fremont bathroom remodel borrow space from a closet?

Yes, that is a common way to fit a larger shower. Because a wall changes, we draw it and file a regular permit.

Do Fremont express permits skip inspection?

No. Every Fremont building permit, express or regular, ends with a City inspection, and we coordinate it.

Where is the R&B office for Fremont bathrooms?

Fremont is served from our headquarters, 84 W Santa Clara St, Suite 700, San Jose, CA 95113. Appointments are set by phone at (650) 800-9661.

Where do I check R&B's license?

Search CSLB #1158657 at the Contractors State License Board to view R&B Master Construction Inc.'s license.

Can I keep using my Fremont house while the only bathroom is remodeled?

Tell us if it is the only bathroom; we plan the order of work around that and discuss temporary arrangements before demolition.

When is tile installed in a Fremont bathroom remodel?

Only after the City has inspected the rough plumbing and the shower waterproofing, so nothing has to be torn out for an inspector.

Begin a conversation

A new beginning.
Let’s talk.

You don’t need to have it all figured out. Tell us where you are with your project, and we can discuss the next step.

(650) 800-9661info@rbmasterconstruction.com

Discuss your Fremont project. Availability is confirmed for your scope and schedule.

What do you have in mind?

Leave an email or phone number. Everything else is optional.

Add project details Optional
Add location, budget or timing Optional details

We’ll contact you about your enquiry. How we use your information.

Call

A good place to begin

Let’s talk about your home.

Leave an email or phone number. Everything else is optional.

Add project details Optional
Add location, budget or timing Optional details

We’ll contact you about your enquiry. How we use your information.